services

Find

Technology partners (ODM) as well as supplier for off-the-shelf or custom components. More

FIND

Technology partners for ODM

  • Digital signage systems / POS (monitor with Touch Screen and embedded computer)
  • Camera (HD, FHD, low light, IPCAM)
  • Audio/Video mixers, extenders, converters (HDMI, YPbPr, VGA, DVI)
  • Sound systems (speaker, microphone)
  • Custom Motherboard (Atom, I3/5/7, ARM Rockchip/AmLogic)
  • Payment means (Bill Acceptor, Coin Acceptor, Card Reader)
  • Media players (TV box, dongle)
  • Media printing (picture, coupon, card)
  • Remote control (RF, IR)

Off-the-shelf components search

  • Computer (industrial, consumer)
  • Monitor (LCD or LED Display, open frame, from 1” to 52”)
  • Touch Screen (SAW, IR, P-CAP, Resistive)
  • LED lighting system (RGB, pure white)
  • Power supply (AC-DC, DC-DC)
  • Security equipment

Custom components sourcing

  • PCB assembly
  • Cables
  • Plastic injection (including mold design)
  • Sheet metal
  • Aluminum casting (gravity, injection)
  • Wood cabinet
  • Kiosk

Establish

Supply Chain strategy, assembly line and
logistics. More

ESTABLISH

Manufacturing facility

  • Contract Manufacturer selection based on the product particularities and its growth
  • PCB assembly only or Finished Product (box-build)

 

Supply Chain and Logistic

  • What to buy where
  • How to best move raw material and finish good
  • Import / Export forwarding and taxes strategies

Tests and Quality Control

  • Test coverage definition and optimization for best business value
  • QC checkpoint definition
  • Onsite auditing

Optimize

Product design and supply chain for manufacturing, quality control and
cost. More

Optimize

  • Design For Manufacturing (DFM) analysis
  • Design For Test (DFT) analysis
  • Cost Reduction analysis (through design and supply chain)

Coach

Identify, select and manage an Asian partner as well as understand Asian culture. More

Coach

Identification

  • Who we need to talk to based on the nature of your product and its components
  • What are potential suppliers for of-the-shelf or custom components
  • Which key technology partners could help you on design and also manufacturing components (ODM)
  • What is the appropriate Contract Manufacturer to build the final product

Introduction

  • How to travel (flights, hotels, local transportation)
  • How to meet suppliers, discuss technical aspect of product
  • What are the meeting conventions
  • How we eat

Timeline / Planning

  • Based on when you want the first container with your product ready to sell
  • Transfer production (aggressive within 3 months or normal pace within 6 months)
  • Start new product (9months or more from design to mass production)